PRODUCTS

+
  • 06(5).jpg

The material available are: carbon steel, alloy steel, stainless steel, brass, bronze, aluminum, POM plastic, PA plastic etc. All the products can be made according to the drawings or samples. The lead time will be around 15 days for the samples without tools, if need tools the lead time for samples will be around 25-35 days. For low value products without tools, free samples can be supplied. The lead time for the mass production will be according to the quantity.


METAL PRODUCTS
Keyword: Metal Products, Fasteners

Detail

RELATED PRODUCTS


Messages